|
Located in Traverse City, Michigan, the scope for this project included removing the existing and installing a new suspended ceiling. Wallcovering, handrail and bumper were installed, painting performed throughout the facility. New wood flooring with inserts was also installed. A new reception area was built with decorative glass. New tile was installed in bathrooms and new cabinets built for kitchen area.
|