|
Located in Hazelton, Pennsylvania, this work was done in 2 phases, in 2 different buildings. The scope of work included removing existing ceiling and flooring and replacing with new, new cabinets were built and installed, painting, wallcovering, handrail, cove base were installed throughout the facility. New tile was installed in shower rooms.
|