home   about us   services performed   contact us
 
 
  Theme Parks - Sea World

 

 

 

SEA WORLD - A WHALE OF AN INDUSTRIAL PROJECT

CHALLENGE: To perform Cleaning, Blasting, and Coatings operations without interruption to any daily scheduled shows.

PROJECT SCOPE:

  • Constructed a massive, mobile, 100% contained operations platform. This platform and containment system was constructed to keep both Shamu and Sea World guests protected from all renovation activities.
  • Waterblasted all surfaces, then Abrasive Blasted all corroded surfaces. SERVICE PAINTING CORPORATION operated a unique “Sponge Jet”-blasting system to reduce all blasting dust by 90%.
  • All surfaces were then spot primed and striped with an Epoxy Mastic followed by a full intermediate Epoxy coating then finished with a High Performance Acrylic.

SPC has also performed hundreds of thousands of dollars in additional Sea World projects, including:

  • Dolphin Stadium
  • Nautilus Theatre
  • Pete's Water Maze
  • The New Water Attraction - "Atlantis"
  • Happy Harbor
  • Kraken


© 2019 Service Painting Corporation. ® All rights reserved.